Project Planner, Notes & Wiki

App Store App Productivity Free
23 Sept 2026launched 13 days ago
–No ratings yetRead reviews
n/aApple doesn’t publish installs
WorldwideSold in 50+ App Store storefronts
1.1latest version · 11 days ago

Screenshots

About

Your whole life, structured — in one calm, private workspace. ProjectOrganizer gives you a flexible, block-based workspace in a fast, native iOS app: Spaces to separate work, life and side projects, pages inside them, and blocks inside those. Notes, projects, tasks, databases and a linked wiki, all in one place. Your workspace, your data — and yours alone. Private by design No account, no login, no sign-up — just open the app and start Everything is stored locally on your device by default Works completely offline — no connection, no problem No analytics, no tracking, no ads, no third-party data collection Optional iCloud sync runs through your own private iCloud — never our servers Structure that grows with you Spaces group work, life and side projects, so nothing bleeds into the wrong context Pages nest as deeply as you need — a wiki is a tree, not a folder Link any page to any other and see the backlinks on both sides Quick Switcher and full-text search find anything in a second A block editor for real notes Headings, to-dos, bullets, numbered lists, quotes, callouts, toggles, code, images and bookmarks Type "/" for the block menu, "[[" to link another page Move, convert and restructure blocks right from the keyboard bar Import and export Markdown — your notes stay portable Export any page as a PDF to hand it to someone Lists that work like databases Add your own properties: text, select, multi-select, number, date, checkbox, URL See the same list as a table, a kanban board, a calendar or a gallery Filter by tag, sort the way you think Projects and tasks Priorities, due dates and reminders A "Due" view that gathers what's on your plate today, across every project Progress at a glance on every project On-device intelligence Turn a goal into a plan, continue writing, or ask a question about the page you're on Powered by Apple's on-device Foundation Models — your text never leaves the iPhone On your Apple Watch Today's tasks at a glance — tap to check them off Capture a task by dictation, due today with one toggle Pinned checklists, like a shopping list, right on your wrist Complications show what's due, even in Always-On Everywhere you work Home Screen and Lock Screen widgets Siri and Shortcuts for capture and navigation Share Extension to send links and text straight into your workspace Spotlight finds your pages from the Home Screen Native on iPhone, iPad and Mac Premium includes Unlimited Spaces (free up to 2) Unlimited pages (free up to 50) Unlimited wikis (free up to 1) Board, table, calendar and gallery views More on-device AI every day (free up to 5 actions per day) iCloud sync across all your devices Every accent color ProjectOrganizer stays out of your way when you just want to write something down, and holds the whole structure when you need it. Subscriptions Auto-renewable Premium plans (1 month, 1 year) A one-time Lifetime unlock is also available Payment is charged to your Apple ID account Subscriptions automatically renew unless cancelled at least 24 hours before the end of the current period Manage or cancel anytime in your Apple account settings Restore Purchases is available in-app Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: https://darianhanci-legal.web.app/datenschutzRead more
Your whole life, structured — in one calm, private workspace. ProjectOrganizer gives you a flexible, block-based workspace in a fast, native iOS app: Spaces to separate work, life and side projects, pages inside them, and blocks inside those. Notes, projects, tasks, databases and a linked wiki, all in one place. Your workspace, your data — and yours alone. Private by design No account, no login, no sign-up — just open the app and start Everything is stored locally on your device by default Works completely offline — no connection, no problem No analytics, no tracking, no ads, no third-party data collection Optional iCloud sync runs through your own private iCloud — never our servers Structure that grows with you Spaces group work, life and side projects, so nothing bleeds into the wrong context Pages nest as deeply as you need — a wiki is a tree, not a folder Link any page to any other and see the backlinks on both sides Quick Switcher and full-text search find anything in a second A block editor for real notes Headings, to-dos, bullets, numbered lists, quotes, callouts, toggles, code, images and bookmarks Type "/" for the block menu, "[[" to link another page Move, convert and restructure blocks right from the keyboard bar Import and export Markdown — your notes stay portable Export any page as a PDF to hand it to someone Lists that work like databases Add your own properties: text, select, multi-select, number, date, checkbox, URL See the same list as a table, a kanban board, a calendar or a gallery Filter by tag, sort the way you think Projects and tasks Priorities, due dates and reminders A "Due" view that gathers what's on your plate today, across every project Progress at a glance on every project On-device intelligence Turn a goal into a plan, continue writing, or ask a question about the page you're on Powered by Apple's on-device Foundation Models — your text never leaves the iPhone On your Apple Watch Today's tasks at a glance — tap to check them off Capture a task by dictation, due today with one toggle Pinned checklists, like a shopping list, right on your wrist Complications show what's due, even in Always-On Everywhere you work Home Screen and Lock Screen widgets Siri and Shortcuts for capture and navigation Share Extension to send links and text straight into your workspace Spotlight finds your pages from the Home Screen Native on iPhone, iPad and Mac Premium includes Unlimited Spaces (free up to 2) Unlimited pages (free up to 50) Unlimited wikis (free up to 1) Board, table, calendar and gallery views More on-device AI every day (free up to 5 actions per day) iCloud sync across all your devices Every accent color ProjectOrganizer stays out of your way when you just want to write something down, and holds the whole structure when you need it. Subscriptions Auto-renewable Premium plans (1 month, 1 year) A one-time Lifetime unlock is also available Payment is charged to your Apple ID account Subscriptions automatically renew unless cancelled at least 24 hours before the end of the current period Manage or cancel anytime in your Apple account settings Restore Purchases is available in-app Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: https://darianhanci-legal.web.app/datenschutz

Store page changes

Title, subtitle, icon, screenshots and price

No changes recorded yet. Each time we check this app we compare its store page with the last one and log what changed. Create a free account and save this app to have its store page checked every day.

Versions

  1. Version 1.1First seen · 24 Sept 2026

    New in 1.1: • Apple Watch: check off today's tasks right from your wrist, capture new ones by dictation and tick off pinned checklists — with complications for your watch face. • Now available in 15 languages. • Widgets reliably show your tasks again. • Better on iPad: pages in a comfortable reading width. • Small celebrations for milestones, plus “Share the app” in Settings. • Siri and Shortcuts always file tasks in the right inbox. • Lots of small improvements and fixes.

Countries

Worldwide

Apple lists this app in 50 or more storefronts, so it is available almost everywhere.

Turkey

Chart positions

Not seen in the charts we track yet.

More from Cengiz Darian Hanci

All apps →

Similar apps